ENGIE Solutions will decarbonize the ENTREMONT site in Guingamp
Description
ENGIE Solutions signed a contract at the beginning of January with ENTREMONT, Guingamp site (22), relating to the design, construction, operation and financing of a biomass boiler room for a period of 15 years.
The ENGIE Solutions teams have designed a tailor-made low-carbon solution for ENTREMONT with a commitment to results. This new installation will in fact make it possible to produce carbon-free steam for the needs of the industrial process and to heat the offices and storage areas, thanks to additional heat recovery from the fumes and the deployment of a hot water network.
The key numbers
• 6.4 MW biomass boiler
• Investment of €9.4 million
• biomass supply 18,000 t/year
• 10,000 tonnes of CO2 avoided per year.